Posted on September 15, 2020 · Posted in Invitation to Bid

Invitation to Bid for Cluster III- Construction of Bucalan Solar Powered Irrigation System and Mangayao  Solar-Powered Irrigation System

Construction Location: Taraka, Lanao del Sur

Construction Duration: 150 Calendar Days

Approved Budget Cost (ABC): P17, 983, 155.44