Name of Project: Cluster 1-Construction of Salvador Concha Solar Powered Irrigation System, Bandera Boisan Solar Powered Irrigation System and Malungun Solar Powered Irrigation System.
Contract Location: Taraka, Lanao del Sur
Contract Duration: 150 Calendar Days
approved Budget Cost (ABC): P26,974,733.16